MAINTENANCE
  The proper maintenance to 
Concrete Mixing Plant 30 cum/hr  Akona-Hycon AP-30  is not only reduce downtime and keep it in good appearance, but also it increase the
stipulated life of it. So all operator should be give good maintenance to 
Concrete Mixing Plant 30 cum/hr  Akona-Hycon AP-30  in its due time without fail
 RECOMMENDED OIL AND PERIODICITY OF
| 
   
Concrete Mixing
  Plant 30 cum/hr  Akona-Hycon AP-30 
 | 
  ||||||
| 
   
Sl No 
 | 
  
   
Assembly 
 | 
  
   
Grade of oil 
 | 
  
   
Qty 
 | 
  
   
Periodicity 
 | 
  
   
Remarks 
 | 
 |
| 
   
01 
 | 
  
   
Engine Oil 
 | 
  
   
20W 40 
 | 
  
   
20 ltrs 
 | 
  
   
250 Hrs 
 | 
  
   | 
 |
| 
   
02 
 | 
  
   
Gear
  box for Skip 
 | 
  
   
Gear oil Grade
  90 
 | 
  
   
7 L 
 | 
  
   
2500 Hrs 
 | 
  
   
500 
  Hrs First 
 | 
 |
| 
   
03 
 | 
  
   
Gear
  box for Pan Mixer 
 | 
  
   
Gear oil Grade
  90 
 | 
  
   
8 L 
 | 
  
   
2500 Hrs 
 | 
  
   
500 
  Hrs First 
 | 
 |
| 
   
04 
 | 
  
   
Gear
  box for Boom Scrapper 
 | 
  
   
Gear
  oil Grade 90 
 | 
  
   
5L 
 | 
  
   
2500 Hrs 
 | 
  
   
500 
  Hrs First 
 | 
 |
| 
   
05 
 | 
  
   
Blade
  Arm housing 
 | 
  
   
Gear
  oil Grade 90 
 | 
  
   
5L 
 | 
  
   
2500 Hrs 
 | 
  
   
500 
  Hrs First 
 | 
 |
| 
   
06 
 | 
  
   
Cement
  screw conveyor 
 | 
  
   
Gear
  oil Grade 90 
 | 
  
   
10 (5 L each up & down) 
 | 
  
   
2500 Hrs 
 | 
  
   
500 
  Hrs First 
 | 
 |
| 
   
07 
 | 
  
   
Hydraulic system 
 | 
  
   
SU / KB 10 W 
 | 
  
   
20 
 | 
  
   
500 Hrs 
 | 
  
   | 
 |
| 
   
08 
 | 
  
   
Compressor   
 | 
  
   
T 57 
 | 
  
   
1 L 
 | 
  
   
1200 Hrs 
 | 
  
   
200 Hrs First 
 | 
 |
| 
   
09 
 | 
  
   
Fuel Tank 
 | 
  
   
HSD 
 | 
  
   | 
  
   | 
  
   | 
 |
a) Engine : Cummins water cooled
Turbo charged
Complete plant can be transported in
one 40 feet Trailer
Boom Scrapper, Aggregate feed chute,
Aggregate weighing batcher,   Concrete
mixer pan type, Cement Silo, Cement feeder system, Portal structure, water
weigh system, Control Panel, Air Compressor & water pump, water pump and
Electrical motors (power source) shall be powered by Gen set 125 KVA 
Self lubricated ZZ type Bearings replace
after every 4800 hrs
Winch system of Scrapper Cabin
Greasing to be done after every three months
The information given above is as
per GMI or manufactures literature. For more technical futures of Concrete Mixing
Plant 30 cum/hr  Akona-Hycon AP-30 refer GMI No 245