Class DEE Lifting Board
A BOO will be detailed by a convening
order from the BRTF against Project HQ- Sale Release Order, for lifting the
class DEE auctioned veh/eqpt/plants. Any Officer (Capt / AE) as Presiding
Officer and any two supervisors as first & second member from any unit with
in BRTF may be detailed. This BOO will responsible for lifting of all the
veh/eqpt/plants as per auction catalogue to the bidder on or before dead line
delivery date and preparation of Lifting Board Proceedings. The format of
lifting board proceedings against IAFD-931 Appendix ‘A’ is as under:-
Appendix 'A' |
||||||||
LIFTING
BOARD PROCEEDINGS CLASS DEE VEH/EQPT/PLANT AUCTION HELD ON-----------
|
||||||||
5xx SS &TC Care HQ 7xx BRTF (GREF) C/O xx APO
|
||||||||
S/No
|
Lot No
|
Items
|
Delivery Order
No & date
|
Name and
address of bidder
|
Gate pass
No & date
|
|||
1.
|
a) ___
b) ___
c) ___
|
|||||||
CERTIFICATE
|
||||||||
1. Certified that, the veh/Eqpt/plants
shown above had been checked on ground as per class DEE documents and found
100% correct.
|
||||||||
2. The
veh/Eqpt/plants shown above had been lifted by bidder on _______
|
||||||||
Presiding Officer:
|
||||||||
Members 1):
|
||||||||
2):
|
||||||||
______
Note: The lifting
board proceedings should be prepared separate for each sale release order. ____________
No comments:
Post a Comment