Deposition of Class CEE Veh/ Eqpt/ Plants
to concerned Base Work Shop
1. As per HQ DGBR letter
No16249/88-93/DGBR/E4 Rep dated 27 July 1988, all veh/ eqpt/ plants (except
light vehs) should be produced to concerned Base Work Shop for a major Over
Haul which is beyond the scope of a field work shop (R4). The major Over Haul
should be carried out in between 60 to 75 % life span of veh/ eqpt/ plant. The
latest economic life span of veh/ eqpt/ plants in BRO is as per HQ DGBR Letter
No 55041/ Life V/E/P/ DGBR/24/ E4 Tech
dated 31 May 2004 (Click here for details) and
55041/Twin Life/ V/E/P/ DGBR/89/ E4 Tech dated 28 Jan 2013 (Newly inducted V/E/Ps) (Click here for details)
2. Base Over Haul of V/E/P is a concept under
which the total life of a Veh/ Eqpt/ Plant can be increased by a major Over
Haul at Base Work Shop in proper time, before excessive worn out of all major
assembles of them. So we can utilise it at maximum before dowongradation to Class
DEE. The class CEE Base Overhaul expenditure will not be exceed the 20% of the
total cost of them, beyond the limit it is consider as uneconomical to
overhaul. (HQ DGBR letter No: 55014/Gen/DGBR/E4 Tech dated 30 Nov 1989)
3. The consideration of veh/eqpt/plants to
class CEE ROP (Roll On Plan) is based on its yearly utilisation. As per its
utilisation, it is calculated when it falls on its 60 to 75 % life span. So V/E/Ps
are picked up from reports/ recommendations from Project HQ. Then final class
CEE ROP prepared by HQ DGBR/ E4 (Repair) and earmarked it’s repair for a
particular month.
4. It is the responsibility of user unit to
produce the veh/eqpt/plants with up dated log book to the concerned field work
shop on work order for class CEE downgradation in time. The field work shop
will carried out a class CEE technical inspection report against form IAF (EME) E-03 (Revised) for vehs and
IAF (EME) E-23 (Revised) for eqpt and plants accordingly. In this effect an
entry will made in log book of the veh/eqpt/plant by field work shop. The final
approval of class CEE downgradation should be given by SO I (EME) of Project
HQ.
5. Chassis
welding or any modifications if there, the relevant entry with HQ DGBR
authority under which same carried out will be made available in the log book
of concerned V/E/P.
6. After
Class CEE approval, the veh/eqpt/plant should be returned to Supply Company
along with log book and connected class CEE documents on
LRIV/ IV by user unit.
7. If the veh/eqpt
was on loan issue to unit, accept them on LRRV and clear transaction in Loan
ledger and then make a TIV/TRV (Transfer issue voucher/ Transfer receipt
voucher) in
duplicate, (One control from V/E/P control register and other from class
CEE control register and it should be filed accordingly) and transfer it
from Central ledger to class CEE ledger. If
it was on regular issue to unit, accept RV directly in to class CEE ledger. Then prepare IV to concerned Base Work Shop and charge
off it from class CEE ledger. Make transfer record as receipt and issue record
in log book accordingly with RV/IV No and date. Hand over IV on covering letter
and log book to the rep of concerned unit for deposition veh/eqpt to Base Work
Shop.
8. There
is no need of move sanction for the veh which moving own stream to Base Work
shop as it is already included in ROP and ordered for deposition. If
eqpt/plants which are shifted through Trailer or Load Carrier then proper Road
move sanction (Click here for Road Move Sanction)
for trailer or load carrier should be obtained from higher authority before
deposition to avoid audit observations in later stage.
9. If
any deficiency/ discrepancy found by R&I section of base work shop on their
inspection that should be regularised by used unit. Then only they accept issue
voucher from Supply Company.
10.
After deposition of the class
CEE veh/ eqpt/ plant, it’s battery should be taken back to the unit, since it
is already has been taken on ledger charge by unit E4 section on CRV.
11. The LRRV/ RV should only be cleared to unit,
when duly accepted voucher from Base Work Shop arrived. (Since it is a
third party acceptance, (only paper transaction made by supply and veh/ eqpt
directly moved from user unit) any discrepancy/ deficiency found by
Base Work Shop in later stage, supply can ask user unit to clear the
discrepancy. Or it will remains with supply’s shoulder).
Class CEE documents
The following documents
are required to produce with the class CEE veh/eqpt/plants to the Base Work
Shop. So before moving for deposition, unit should be sure that, all documents
are correct at unit location, to avoid consequence in later stage since unit is
far away from Base work shop and nobody is there for help.
1.
|
Duly approved
Class CEE Technical inspection report.
(IAF (EME) E-03
(Revised) for vehs and IAF (EME) E-23 (Revised) for eqpt.
|
2.
|
Log Book duly updated in all
respect.
|
3.
|
Non Retrieval Certificate from
concerned work shop.
|
4.
|
List of Major assys/ Spares required
for over haul, issued from concerned work shop.
|
5.
|
CRV of retrieved battery.
|
6.
|
Low utilisation certificate for
tyre. (if life not achieved)
|
7.
|
Issue Voucher of veh/ eqpt.
|
All
above documents should be produced to R&I section of Base Work shop for
their acceptance. R&I Section will carry out a receipt or in inspection of
veh/ eqpt/ plant and check any deficiency/ discrepancy, damages, chassis
welding and modifications if any. If any deficiency/ discrepancy found by
R&I section of base work shop that should be regularised by used unit. Then
only they accept veh/ eqpt/ plants.