DIRECTOR GENERAL
BORDER ROADS
GENERAL MAINTENANCE
INSTRUCTION NO: 241
ON OPERATION AND MAIN TENANCE OF
CONCRETE MIXER GAMZEN 750 RD
INTRODUCTION:
(a) The
Gamzen Model RD-750 reversible drum Concrete Mixer batch type of 0.5 cubic meter
mix output per batch fitted with Kirloskar air cooled diesel engine HA-394
developing 20 HP@ 1500 RPM at NTP fitted with cold starting device/aid, having
three weighing aggregate bin, electronic weighing system with load cell, water
flow electronically controlled with auto cutoff.
(b) This
GMI gives the technical specification and know how on the operation, maintenance
and repair procedure of Concrete Mixer Gamzen 750 RD to ensure maximum
performance and safe/satisfactory operation. Compliance with procedures given
in this GMI will enable to get desired maximum service from the equipment.
(c) Maintenance
of Concrete Mixer Gamzen 750 RD will lead to long life, trouble free operation
and less frequent break downs and also to reduce maintenance cost. The periodic
maintenance must be carried out according to the ‘Periodic Maintenance Schedule’
described in this GMI. Periodic Maintenance is essential for preventing troubles
and accidents to ensure satisfaction and safety. Daily care and inspection is
essential for prolonging the operating life of the equipment and for its safe operation.
All information and instructions given in this GMI is based on the latest Operator’s
manual and service booklet provided by the firm.
AIM:
The instructions are issued as guidelines for general, preventive
maintenance schedule and lubrication of Concrete Mixer Gamzen 750 RD
manufactured by M/s Gamzen Plast Pvt Ltd for regular attention to keep the equipment
in good mechanical condition which must be strictly followed.
ACTION BY:
a)
|
User unit: To
carryout periodic inspection and monitor regular/periodical maintenance
as
laid down in this instruction and record the tasks done in log book.
|
|
b)
|
Field Workshop :
|
|
|
i)
|
To carryout and monitor maintenance
schedule and oil changes as per
periodical maintenance laid down in the
maintenance instructions and to check
the record of maintenance including
lubrication.
|
|
ii)
|
To advise the user unit in respect of any
lapse noticed.
|
c)
|
Mobile Maintenance Team: To ensure that proper maintenance is
carried out and
submit report accordingly to Task Force Commander and OC Wksp
for their necessary
action.
|
DETAILS:
This
instruction includes the following aspects:-
a)
|
Operating Procedure
|
Appendix ‘A’
|
|
b)
|
Periodic Maintenance schedule
|
Appendix ‘B’
|
|
c)
|
Technical Specification
|
Appendix ‘C’
|
|
d)
|
Installation of concrete Mixer
|
Appendix ‘D’
|
|
|
|
|
|
|
|
(V N Singh)
|
|
|
|
SE (E&M) FS
|
|
|
|
Director (Tech)
|
|
|
|
For Dir Gen Border Roads
|
|
|
|
|
|
|
|
Appendix ‘A’
|
|
OPERATING PROCEDURE
|
|
||
1. Do
not operate the Machine without Engine Guard ever as fine particles of Cement /
Dust are likely to enter through Air Cooler/Air Intake element. Once the Dust
enters the Engine, the Engine life will be compromised. Please ensure that
after every Check up/Maintenance Guard is replaced.
2. Cold
Starting arrangement should be strictly used for operating very near and below
sub zero temperatures only otherwise engine can be severely damaged beyond
repairs as specified by engine manufacturer in their operation &
maintenance manual.
3. When
loader Bucket is in operation water filling valve should always remain in
closed position. Since the supply of Hydraulic oil to water valve is through
the loader bucket valve, this develops air blockage in the system.
4. Dial
Gauge calibration/Electronic weighing is valid for 6 months only from the date
of manufacturing of the machine as per weights and measures department Govt. Of
India hence it is advisable to recalibrating it after 6 months.
5. Drum/Cylinder
relief valves pressure is pre-adjusted.
6. While
starting the Engine Drum/Cylinder Valve should be in neutral position.
7. While
stopping the Engine, Drum should not be rotating i.e. It should be stationary.
8. Dial
Gauge is calibrated for 1200 Kgs. Do not exceed above 1050 Kgs. (This is not
applicable in Electronic Weighting Machine).
9. In
electronic weighing machines load cell is calibrated for 1200 Kgs.
10. Water
filling operation cannot be carried out while material is transferred from
Bucket to drum i.e. at all other time while bucket is loaded or lowered or
while idling water can be filled in the Tank/Drum
.
11. During
transportation the loader bucket should be in loading position and chain in
hooked position at the same time pressure should be released from the system
and bucket load should be on the chain.
12. In
case of electronic weighing machine Loader Bucket should be in down position.
13. Loader
Bucket/Hopper should not be banged while Loading/Unloading the material. The calibration is directly connected with
the Loader Bucket. The calibration is
directly connected the Loader Bucket.
The calibration will not be disturbed if this care is taken. In case of electronic weighing machine Load
cell will get damaged.
14. Ensure
before starting Water Pump, the Pump has to be primed first & then start
the Water Pump. Non-return foot valve is
to be fixed on water suction line.
15. Ensure
the Water Pump should not run dry or else the Pump seal will be damaged
instantly.
Do’s
Check all the electrical connection for tightness.
Check the hydraulic & engine oil level.
Check the drive assembly.
Check all the lubricating points.
Check whether the machine is on level surface.
Check all the nuts & bolts for tightness regularly.
Check the proper resting of the hopper.
Operate the machine only by trained operator.
9. Maintain the log book properly
& daily.
Don’ts
1. Do not operate the machine
if electrical connections are loose.
2. Do not operate the machine
if oil is below minimum level.
3. Do not operate the machine
if assembly is not proper.
4. Do not operate the machine
if lubricating points are dry OR less oiled.
5. Do not overload the machine.
6. Do not operate the machine
if nut bolts are loose.
7. Do not operate the machine
if operator is not properly trained.
PERIODIC MAINTENANCE SCHEDULE
1. Use
Engine Oil SAE 15W 40 or as specified by engine manufacturer in their operation
& maintenance manual. Filter element to be replaced after 50 Hours of
operation. Next change of filter element is after 100 Hours run and thereafter
at every 500 Hours run.
2. Fuel
Oil/Diesel Filter elements to be replaced after every 500 Hours of operation as
specified by engine manufacturer in their operation & maintenance manual.
3. Air
Intake Filter element is Oil submerged type. After first 50 Hours cleaning is
to be done. Thereafter at every 100 Hours cleaning and replacement of Oil of
Grade (SAE 20W / 40) is to be done (Approximately 50 ml). It is very essential
that this is done regularly because Dust/Cement particle are most likely to
enter the Engine through this element (This is not applicable in air cooled
engines).
4. Hydraulic
oil Filter suction side to be replaced initially after 500 Hrs, thereafter
every 2000 Hours of operation. This element cannot be cleaned and reused. If
not replaced in specified duration it will result in damages to Hydraulic
pump/Motor.
5. Hydraulic
oil Filter return line side to be replaced initially after 500 Hrs, thereafter
every 2000 hours of operation. If required this element can be cleaned and
replaced.
6. Clean
Hopper & Mixer Drum daily at the end of operation. Anything setting inside
these units will affect efficiency of Machine.
7. Grease
Hopper Pin daily (Two Grease Nipples are provided on Hopper Pin).
8. Grease
Bearing of Pinion Shaft daily. (Two Grease Cups are provided on Bearing Plummer
block).
9. Grease
Gear coupling periodically.
10. Use
Cardium compound on Drum Crown Wheel and Pinion periodically.
11. Check
connections of Hose pipes daily, if leakage is observed, immediately attend the
same.
12. Check
the spline coupling connection between Engine and Pump and Grease daily.
13. After
every 500 working Hours Check clearance between Crown Wheel and Rollers by
moving Drum in Clockwise and Anti-clock wise direction. If it is not rotating freely or rotating very
freely then use jacking bolts provided in the Top Roller for adjusting. Adjustment done should be accurate otherwise
it would cause Noise, Vibrations and Stress to the rotation.
14. Check
backlash between crown wheel tooth and pinion tooth, adjust if required.
15. Change
Hydraulic oil Grade 68 & and fill up by looking at the visual level
indicator.
16. Recommended
Gear Oil grade (140) or grade (80W 90).
TECHNICAL SPECIFICATION
Description
|
:
|
Concrete Mixer Gamzen 750 RD.
|
Engine
|
:
|
Kirloskar HA 394 Air cooled diesel Engine.
|
Machine Capacity/Power
|
:
|
750 Ltr/20 HP Engine @ 1500 rpm.
|
Drive
|
:
|
Hyd motor.
|
Machine Frame
|
:
|
Rectangular and Hollow.
|
Gear Ring
|
:
|
Solid Steel.
|
Mixing Blade
|
:
|
8 Nos.
|
Weighing
|
|
|
Dial Gauge
|
:
|
1200 Kgs.
|
Electronic Load Cell
|
:
|
1 / 2 / 3 Bin.
|
Dimensions
|
|
|
Length of the machine
|
:
|
3500 mm.
|
Width of the machine
|
:
|
2200 mm.
|
Height of the machine
|
:
|
2800 mm.
|
Output
|
:
|
15 Cum.
|
Drum length
|
:
|
1990 mm.
|
Drum diameter
|
:
|
1295 mm.
|
Rotary speed of mixing drum
|
:
|
16/20 rpm.
|
Size of drum opening
|
:
|
535 mm.
|
Water Tank
|
:
|
180 Ltrs.
|
Pneumatic wheels/ Tyres
|
:
|
6.00 x 16.
|
Loading/weighing
|
:
|
Hydraulically.
|
Hydraulic Fluid
|
:
|
Hydraulic-68.
|
Hydraulic Tank
|
:
|
135 Ltrs.
|
Dial calibration
|
:
|
1200 Kgs.
|
Drum discharge height
|
:
|
1500 mm.
|
Mechanical Slew Jacks
|
:
|
04 Nos.
|
Electronic Load Cells
|
:
|
Digital/Electronic.
|
Electronic Water meter (Optional)
|
:
|
Digital.
|
Ad. Mixer unit (Optional)
|
:
|
Digital.
|
Print out facility (Optional)
|
:
|
Inbuilt printer.
|
Battery
|
:
|
12 V x 120 AH.
|
INSTALLATION OF CONCRETE MIXER
1. 02
Nos hooks are provided on the mixer body stand for loading/unloading. Machine can be positioned and leveled by Supports
so as to enable it to mix or discharge the aggregate in best possible way. Connect the water supply. The Dial Gauge is pre-calibrated. Both control valves pressures are pre-set.
2. Before
starting the mixer ensure that machine is leveled properly to minimize
vibrations and jerks since heavy vibration disrupts the water intake system
& Calibration System.
3. While
operating lower the Hopper using control lever ensuring it does not touch the
ground When the Dial Gauge shows “0”.
Cylinder should be partially open (Approximately 5 to 10 mm) so the
system is pressurized or activated. (This is not required in case of electronic
weighing machines).
4. Now
load the material into the bucket ensuring a first layer of gravel
(aggregates), cement followed by sand (Followed by more sand and gravel). Start the drum, enabling it to turn in the
mixing direction. Add half the water
required for mixing. Allow the bucket to
ascend by using the distributor lever.
After the bucket ha ascended, wait for it to have completely unloading
the material into the drum. Add the
remaining water. After mixing, stop the drum, wait until it is completely at stand
still and reverse the rotation direction to unload the concrete. (It is
advisable to complete the unloading of the concrete with no interruptions).
5. It
is obvious that the above mentioned cycle refers to a single operation, but
when the machine is working, the operator can load the bucket while mixing is
accomplished. This practice will reduce
work time to the minimum while the machine will be able to achieve the highest
possible hourly concrete output.
6. Suction
pipe used to supply water to water pump should be of non collapsible type.