DIRECTOR GENERAL BORDER ROADS
GENERAL MAINTENANCE INSTRUCTION No: 33
MOBILE
MAINTENANCE TEAM
1. Mobile
Maintenance Teams will be organized in each Task Force and will be responsible
for specialized maintenance aspects. This Team will work on a schedule under
control of the Task Force Commander and carry out specialized maintenance
(hourly and mileage task) on the vehicles and equipments held by the Task Force
at regular intervals. All vehicles and eqpts will be attended to by this Mobile
Maintenance Team once a quarter. Normal
maintenance and adjustments will still be the responsibility of drivers and
operators.
2. As the operating conditions in different
Projects are not uniform, detailed procedure for operating of the Team may be
laid down by the Projects. The following
points may be incorporated while drafting the procedure.
(a)
|
The team
should move as per the planned program to various units.
|
(b)
|
Special
lubricants/Grease which may not be held by each unit may be carried by this
team.
|
(c)
|
Will carry
fast moving spares like fan belts, clamps, hoses & filters of various
types etc so that these can be replaced in situ. The job cards will be made and booking of
stores will be done as per para 3 below.
|
(d)
|
Periodical
adjustments/checks like track tension, brake and clutch free play, tappet
clearance, spark plug gaps, efficiency of injector will be carried out and
recorded in the log book.
|
(e)
|
The team
should carry out preventive repai4rs in addition to checking that maintenance
for which the holding unit is responsible has been carried out. A record of
period maintenance for each vehicle and equipment will be maintained as per
appendices ‘A’ & ‘B’ respectively. These records will be checked by I/C
Mobile Team.
|
(f)
|
A register
may be kept by the Team with adequate pages for each vehicle/equipment. The
lack of maintenance for which unit is responsible if noted on any vehicle/ eqpt
will be recorded in this register. The unit concerned will be informed with
copy to HQ Task Force for necessary action. This Register should be checked
by the visiting officers from the Projects HQ.
|
(g)
|
Availability
with the holding unit of essential tools in serviceable condition will be
checked and results reported to Project HQ for further action. Grease guns should have suitable adopters
to reach all Grease Nipples and this will be checked by the Team by asking
Operator to grease his vehicle/equipment in their presence. Tyre pressure
gauge, fuel funnels, wheel spanner, jack, spark plugs spanner screw driver,
pliers, Hydrometer, high rate discharger are some of the essential tools.
|
(h)
|
Condition of
oil in various assemblies, condition of fuel and oil filter and periodicity
of the oil change and replacement of filter elements as per the laid down
frequency should also be checked by Mobile Maintenance Team.
|
Booking of Spares by Mobile maintenance
Team
3. There may be instances where certain fast
moving spares, like filter elements, CB points, fan belts and spark plugs are
required to be replaced by Mobile Maintenance Team.
Record of
periodic maintenance ‘B’ vehicles
Km & Date
|
Km & Date
|
Km & Date
|
Km & Date
|
Every
1600 Km
1.
|
Engine
oil changed and magnetic.
|
|
2.
|
Drain
plug cleaned.
|
|
3.
|
Air
cleaner cleaned and oil changed.
|
|
4.
|
following
assys oil level checked and topped up :-
|
|
|
i)
|
Gear
Box.
|
|
ii)
|
Transfer
case.
|
|
iii)
|
Axles.
|
|
iv)
|
Steering
gear box.
|
5.
|
i)
|
CB
points gap checked and adjusted.
|
|
ii)
|
Spark plugs
cleaned and gaps checked.
|
6.
|
Check
and lubricate all grease points.
|
Every 3200 Km
1.
|
Oil fitter
cleaned /replaced.
|
2.
|
Primary stage
filter element cleaned.
|
3.
|
Final stage
filter element replaced.
|
4.
|
Tyre rotation
carried out.
|
Every 8000 Km
1.
|
Engine sump
cleaned.
|
2.
|
Oil pump screen
cleaned.
|
3.
|
Injector’s
nozzle tested & serviced.
|
4.
|
Fuel tank
cleaned.
|
5.
|
Cooling system
flushed out.
|
6.
|
Moisture from
servo cylinders drained.
|
7.
|
Gear box, transfer case, Axles & steering gear box oil changed.
|
Notes:- The periodic maintenance points listed in the
Appendix are as a guide. These may be supplemented as per detailed instruction
issued on the maintenance of various vehicles.
Every 50 hrs
1. Lubricated or checked lubrication
of:
a)
|
Water pump.
|
b)
|
Speed Governor.
|
c)
|
Change air cleaner oil.
|
d)
|
Hour meter.
|
e)
|
Starting clutch.
|
f)
|
Clutch fork.
|
g)
|
Starting engine gear case.
|
h)
|
Starting motor and Generator.
|
i)
|
Steering clutch.
|
j)
|
Brake pedal shaft.
|
h)
|
All grease points of tracks and suspension.
|
2. Drain sludge of
a)
|
Oil filters.
|
b)
|
Fuel filters.
|
c)
|
Clean air cleaner element.
|
Every 100 hrs
a)
|
Engine oil changed. (where applicable)
|
b)
|
Air cleaner element cleaned and oil changed.
|
c)
|
Oil filter element cleaned.
|
Every 200/250 hrs
a)
|
Engine oil changed. (where applicable)
|
b)
|
Speed governor oil changed.
|
c)
|
Staring engine oil changed.
|
d)
|
Pre fuel filter element cleaned.
|
e)
|
Oil filter element changed.
|
f)
|
Injection pressure and spray condition checked.
|
Every 500 hrs
a)
|
Gear box and final drive oil changed.
|
b)
|
All level box gears oil changed.
|
c)
|
Sump removed and cleaned.
|
d)
|
Oil strainer in sump cleaned.
|
e)
|
Fuel tank cleaned.
|
f)
|
Fuel filter paper element changed.
|
g)
|
Radiator flushed oil.
|
Note:-The periodic maintenance points listed in the
Appendix are as a guide. These may be supplemented as per detailed instruction
issued on the maintenance of equipment.
4. Following procedure will be adopted
for booking of spares consumed by them:-
a)
|
Fast moving
stores will be drawn from the Field Workshops on loan Voucher before leaving
the unit.
|
b)
|
The stores
consumed on any equipment during the process of maintenance will be entered
in the Log book of the equipment as
well as in a register to be maintained by the I/C Mobile Maintenance Team against each BA/ EM No.
|
c)
|
On return a
proper Job Card will be opened by the Field workshop for each equipment and
the stores consumed by the team entered therein.
|
d)
|
An expense
Voucher for the items consumed by the Filed Workshop and signature of I/C
Mobile Maintenance Team Obtained against each item.
|
___________
No comments:
Post a Comment