Some time we facing with adoption of Usage Rate of Vehicle /Equipments and Plants in different calculations to find out the rate in respect of the utilisation of them per Kilometers / Hours. With out a specified usage rate we can not proceed further and awaiting for arrival of Usage rate. So our work should be keep in pending. To avoid such circumstances Calculation of Usage Rate of Veh/Eqpt/Plants Should be known to us.
UR = 1.65x X x1.02
L
Where ,
X is the Book Value of the V/E/P.
L is the laid down Life of the V/E/P.
Note : It is included 2% reserve Charges.
Auth : HQ DGBR letter No 55055/Del Power/DGBR/ 147/E4 Tech dated 01 Sept 2011.